Home » Farming and Environment » Options to tackle river’s ‘dire sand slug’

Options to tackle river’s ‘dire sand slug’

SIX options are being explored to reduce the massive sand slug in the Barmah-Millewa reach of the Murray River, which will have “dire consequences” to water users, the environment and community if no action is taken to address it.

The Barmah-Millewa reach is the narrowest section of the river that runs through the Barmah-Millewa Forest near Echuca and Deniliquin in the mid-Murray region. Capacity through the Barmah-Millewa reach has reduced from 11,300 megalitres per day in the 1980s to 9200 gigalitres per day today.

Independent experts in fluvial geomorphology, stream management and river research have been gradually surveying the riverbed over the past 18 months and estimate 20 million cubic metres of sand is on the riverbed between Yarrawonga and Picnic Point.

Murray-Darling Basin Authority (MDBA) director of Murray River operations Tyson Milne told delegates at last week’s River Reflection conference it’s understood the sand was largely caused by land-use practices and mining in the rivers upstream centuries ago.

“We are talking about 13 Melbourne Cricket Grounds full of sand which is quite phenomenal,” Mr Milne said.

“There is no silver bullet to this complex problem and the ecological, cultural, economic and community implications of any course of action are being considered.

“We cannot afford to do nothing, because the problem is getting worse.”

Studies show the sand is continuing to move downstream, and into the RAMSAR-listed national parks, increasing erosion and impacting cultural sites and access to recreational areas. The build-up of sand is also increasing the risk of the Murray River changing its course.

“Within 10 years, the build-up of sand in the Barmah-Millewa reach will have a major impact on our ability to deliver water downstream,” Mr Milne said.

“Over the past 12 months we have been talking with the community, First Nations groups, irrigators, government and councils to get their perspectives and input on how this problem could be addressed.”

Drawing on the input from the community, and extensive investigation and independent research, the MDBA has been asked by Basin State Governments to develop options for governments to consider.

The six options being explored are:

– A five-year project to stabilise banks and reduce degradation to prevent further losses into the Barmah Millewa Forest;

– Selectively removing the sand from key locations where riverbank erosion is accelerating, causing environmental, cultural loss;

– Making changes to timings of water transfers to Lake Victoria-Tar-Ru;

– Using Goulburn Murray Irrigation District’s existing and new infrastructure to relieve pressure on the Barmah-Millewa Reach;

– Using Murray Irrigation Limited system to deliver water to natural ephemeral creeks of the Edward/Kolety-Wakool-Niemur river system;

– Assessing the potential to transfer Snowy releases to the Murrumbidgee for delivery to the Murray River.

A preliminary scoping report will be published by July 30, with a business case due in late September, and final report in December.

Digital Editions


  • Honouring a rock icon

    Honouring a rock icon

    FOR Dellacoma Rio, fronting the Australian INXS Tribute Show is more than just a role, it’s a responsibility. Under the lights, Rio transports audiences to…

More News

  • Reconstruction project underway

    Reconstruction project underway

    SWAN Hill Rural City Council will begin works on the Karinie Street Reconstruction Project this week, with completion expected by the end of the year. Council’s director of Infrastructure, Leah…

  • Thrills and spills headline Berri rodeo

    Thrills and spills headline Berri rodeo

    THOUSANDS of people converged on the small Mallee town of Berriwillock at the weekend for the return of its highly anticipated annual rodeo, transforming the usually quiet community into a…

  • Three-way contest for Farrer candidacy

    Three-way contest for Farrer candidacy

    ONE Nation has announced the three candidates who will face party members in Albury on Saturday to determine who will stand in the Farrer by-election. Party leader Senator Pauline Hanson…

  • Telstra upgrades improve connectivity

    Telstra upgrades improve connectivity

    TELSTRA is in the process of upgrading its mobile base station that services Balranald to bring a better 4G/5G user experience. Telstra said the upgrades would improve the mobile site’s…

  • Active portfolio

    Active portfolio

    MAJOR infrastructure projects worth millions of dollars are reshaping Swan Hill and surrounding towns, with two landmark developments now open and a further $24 million in works in the pipeline.…

  • Rams make history

    Rams make history

    MURRAY Downs have claimed victory in their very first Northern Valley premiership with a nail-biting finish that went down to the very last end. The final score was 52 shots…

  • Ireland: The Voyage comes to town

    Ireland: The Voyage comes to town

    LOCALS are preparing for a journey across the Emerald Isle as the critically acclaimed theatre production Ireland: The Voyage arrives in Swan Hill on Sunday. Spanning eras of prehistoric Celts,…

  • Drawing cultural connections

    Drawing cultural connections

    Sora Shim grew up in Seoul, South Korea, in a bustling household with five siblings. By age six, her family had moved 12 times, shaping her sense of responsibility and…

  • Raiders rout Roodogs

    Raiders rout Roodogs

    Barham-Koondrook have stormed their way into this year’s SHDCA A grade grand final after a comprehensive eight-wicket win over a disappointing Ultima-TUF on Saturday. In a ruthless display of skill…

  • Ley officially resigns

    Ley officially resigns

    SUSSAN Ley has formally quit Parliament, two weeks after being ousted from the Liberal Party’s top job. Her resignation as the member for Farrer will trigger a by-election in her…