Home » News » Page 431

News

  • Firefighters prepare for all scenarios

    Firefighters prepare for all scenarios

    TWENTY-five new Forest Fire Management Victoria (FFMVic) seasonal firefighters were put through their paces in Mildura last week as part of a rigorous training course…

  • Speewa Ferry service still running

    Speewa Ferry service still running

    AS the water keeps rising in the Murray River, one crossing that will be able to keep operating for a bit longer is the Speewa…

  • Piangil flood pop-up meeting

    Piangil flood pop-up meeting

    DOZENS of residents and business operators shared their concerns with authorities during community drop-in sessions at Piangil and Nyah on Wednesday. Mallee Catchment Management Authority…

  • Swan Hill pumps up fuel prices

    Swan Hill pumps up fuel prices

    IT has taken a while, but fuel prices have started rising in Swan Hill, even as flooding across Victoria interrupts deliveries to service stations. The…

  • Swan Hill flood to be ‘very similar to 1993’

    Swan Hill flood to be ‘very similar to 1993’

    HUNDREDS of concerned community members gathered at the Swan Hill Town Hall on Monday evening to get a clearer understanding of flood risks to the…

  • Rapid effort to fill Swan Hill sandbags

    Rapid effort to fill Swan Hill sandbags

    MORE than 37,000 sandbags have been filled in Swan Hill since Saturday morning in an attempt to get a head start on flood preparations. With…

  • ‘42,000 potholes’: Victorian road repair efforts continue

    ‘42,000 potholes’: Victorian road repair efforts continue

    DINGHIES, drones and even divers could assess the condition of hundreds of bridges and vital transport infrastructure as part of an emergency road repair program…

  • Riverfront residents monitor Tyntynder levees

    Riverfront residents monitor Tyntynder levees

    TYNTYNDER residents are walking the river banks looking for weak spots and levee damage to be fixed before the Murray River peaks. Geoff Carson, who…

  • Swan Hill V/Line services suspended

    Swan Hill V/Line services suspended

    A SWAN Hill line train has been grounded since October 13, with all services suspended “until further notice”. With Kerang isolated and surrounded by water,…

  • KerangLink on fast track, says Albanese

    KerangLink on fast track, says Albanese

    THE KerangLink electricity interconnector will be fast-tracked and completed by 2028, under a joint plan by the federal and Victorian governments. Prime Minister Anthony Albanese…

Digital Editions